RM Analyzer Help

Action: GoCrt

Certain plot file can be shown on the screen during the calculation process

SettingDescription
Action will be skipped (Option) The action will be skipped in the calculation process if the option is selected.
Plot file Name of the plot file

Press the arrow beside to choose between existing plot files!

(From directory) Name of original file directory
  • Blank - Root directory of local project
  • *     - Directory of current active construction schedule
  • Name  - User defined directory
Delta-T Duration of the Action (not applicable for this action)
Description Descriptive text for the selected Action (max. 80 characters)